Data Centres/Office Buildings

Data Centres

Data centres offer data storage capacity for a variety of clients. Those centres are operational continuously as all that data must be available 24/7. Storing the data requires a large amount of servers which in turn requires enormous cooling capacity to keep working temperatures for the computers at an optimal level. A large number of chillers can therefore be found at such centres.

But even then the cooling capacity may not be as required. It is for this reason that many of the data centres choose for adiabatic cooling. This continuous spraying of water on the heat exchangers gives extra capacity but also causes severe (galvanic) corrosion and often deposits of calcium which in turn diminishes the cooling capacity again. Anti-corrosion protection of those exchangers is vital to keep the equipment performing at top level.

Cooling with high efficiency & reliability

Blygold heat exchanger protection will minimize capacity loss of an installation caused by corrosion and pollution. Through a remarkable application technique the total heat-exchanging surface will be protected with a thin but dense coating layer, extending the lifetime of the heat exchangers. The risk of breakdowns will be much lower, and related costs can be avoided. Substantial savings can easily be obtained simply by having the heat exchangers treated by a Blygold certified applicator before or even after installation.

If you would like to discuss our solutions and applications for data centres, please contact us.

A selection of references

  • ANZ Datacentre
  • Datacom- Albany
  • Spark Datacentre
  • Vodafone

Contact us for more information.

Office Buildings

Blygold is the number one choice for protection against corrosion of air conditioning systems in world famous office buildings throughout the world.

Office buildings depend greatly on the air conditioning system to control productivity and energy consumption. The ever increasing outside air pollution, salty winds and industrial gasses create a corrosive environment for the air conditioning systems. A corroded air-cooled heat exchanger causes a higher condensing temperature. This results in higher energy consumption and reduced cooling capacity.

Offices all over the world use Blygold to ensure a highly efficient, sustainable and energy saving air conditioning system.

Case Study

Blygold is proud to protect the climate systems at the European Parliament, Belgium.

Benefits

  • Energy savings up to 20%
  • Extends the lifetime of the climate system
  • Prevents breakdown of the climate system
  • Improves health and productivity of employees

Some of our clients

“Agreeable working conditions are characterized by a suitable climate”

“We use much less energy, we recouped the costs within a year”

“We are assured of a reliable climate system”

A selection of references

  • AUT (Auckland University of Technology)
  • Viaduct Development
  • Auckland City Council
  • Rabo Bank Building
  • Fisher & Paykel
  • Manukau Mall

Contact us for more information.

Subscribe to receive our newsletter.

59 Elizabeth Knox Place
St Johns Auckland 1072
New Zealand
T. +64 9 948 1560
E. xavier@blygold.nz

Go to contact page

Blygold works with a global network of the best trained and licensed applicators, creating the same high-level of quality applications all over the world. Our Global Quality Standard, thoroughly tested products and specialised unique application techniques offer the best corrosion protection measures available.

If you are interested in becoming a Blygold Partner, please click here for more information.

      

© 2020 Blygold   ·   Disclaimer   ·    Privacy